Kellogg Middle School

Owner
Shoreline Public Schools
Architect
Mahlum
Structural Engineer
Coughlin Porter Lundeen
General Contractor
Hoffman Construction
Location
Shoreline, WA
Year Completed
2020
Project Size
23,000 ft² / 2,140 m²
Timber Installer
StructureCraft
Sector
Educational
Profile
Acoustic
Species
SPF
Finish
KP-12
Project Description
First Acoustic Dowel Laminated Timber Project in the United States. This new middle school in Shoreline, Washington uses DLT roof panels over the entry/commons area as well as the library. The panels not only address the structural requirements, but offer a beautiful finish ceiling with acoustic attenuation (NRC of 0.70). Integrated between each panel is a linear chase, up to 11" wide, that houses conduits and lighting.

